Dear TRNSYS users,
I'm simulating a radiative floor system
defining an active layer with the specific function of PREBID. When I choose
as output of the type 56 the Predicted Mean Vote I obtain an unespected result:
in the heating/cooling seasons PMV is in the range -0,3/0,3, but in the
intermediate (when the equipment is OFF) PMV reaches hight values (more
than -1,5/1,5).
Anyone can help me to understand this
strange behavior?
Thanks in advance
Maurizio Sorce
Department of Energy and Environmental Research (DREAM)
Università degli Studi di Palermo