[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Simulation of an existing building



Dear TRNSYS-users,
we are trying to simulate an existing building with Type56, using 
measured weather data. We use the ideal heating-system included in 
Type56 but the heat output is much higher then the measured.

Has someone with more experience an idea about this fact?

Can someone send  me a working deck of a Type56 combined with a 
heating-system including pipes, a pump, radiators,.....?
 
Thanks for answers


_
Ralf Blachnik
Fachhochschule Hannover
Fachbereich Maschinenbau
Bereich: Energiesystemtechnik
Ricklinger Stadtweg 120     
30459 Hannover
Telefon: (0511) 9296-396
Telefax: (0511) 9296-99 396
e-mail: ralf.blachnik@mbau.fh-hannover.de